
Evolution of GSM-R
Published: 01 April 2015
Studies
Studies
This is the draft Final Report for the study “Evolution of GSM-R”, study ERA/2014/04/ERTMS/OP6, which is being conducted by IDATE and WIK-Consult GmbH for the European Railway Agency (ERA).
The document is published in the interest of soliciting feedback from interested parties, and to support future planning on the part of the ERA in particular and the European rail sector in general.
Study on the evolution of GSM-R by IDATE-WIK
English (4.74 MB - PDF)